EIR: WWD1 Re-entry Programme, GEL 167 (.PDF) 1013KB
Dated November 2005.
SEO: Geothermal Exploration Drilling (.PDF) 640KB
Approved and gazetted 16 February 2006.
Significance Assessment: WWD1 Re-entry Programme (.PDF) 15KB
EIR: Chowilla 1 Geothermal Exploration Drilling, GEL 175 (.PDF) 877KB
Dated November 2007.
SEO: Chowilla 1 Geothermal Exploration Drilling, GEL 175 (.PDF) 147KB
Approved and gazetted 15 November 2007.
Significance Assessment: Chowilla 1 Geothermal Exploration Drilling, GEL 175 (.PDF) 102KB
EIR: Cooper Creek Water Extraction (.PDF 336 KB)
SEO: Cooper Creek Water Extraction (.PDF) 19KB
Significance Assessment: Cooper Creek Water Extraction (.PDF) 159KB
EIR: Habanero 1 Drilling and Stimulation (.PDF) 1.1MB
SEO: Habanero 1 Drilling and Stimulation (.PDF) 36KB
Prepared as a demonstration of compliance with the Cooper Basin Drilling SEO, as such no assessment was required.
EIR and SEO: Habanero Circulation Diagnostic (.PDF) 406KB
Significance Assessment: Habanero Circulation (.PDF) 16KB
EIR: 1MW Geothermal Power Plant at Innamincka
Appendices A-B
Appendices C-E
Dated August 2008.
SEO: 1MW Geothermal Power Plant at Innamincka
Approved and gazetted 28 August 2008.
Significance Assessment for 1MW Geothermal Power Plant at Innamincka.
Construction and operation of the geothermal power plant were classified as LOW ENVIRONMENTAL IMPACT. Assessment is provided here.